Date of completion: 08-2020 Service: Installation Osmose System Location: Sidi Yahya Water Capacity: 125 M3/H Duration of work: 2 Months Sector of activity: Food Production
Challenge:
Challenge:AL KHALES GROUP, a key player in diverse industries, brought forth a substantial challenge for Casamerchants. In their pursuit of expertise to optimize water usage and enhance sustainability within their industrial processes, AL KHALES GROUP specifically highlighted a challenge related to the quality of well water. The well water, being saline, presented a notable obstacle, particularly in the cultivation of the Berry. The high electrical conductivity (EC) of the water was unsuitable f
Solution:
Implementation:
Results:
Solution:Casamerchants, in response to the challenges presented by AL KHALES GROUP regarding saline well water, implemented a comprehensive solution. This involved the supply, installation (including pumps and reverse osmosis systems), and commissioning of a water treatment station at Sidi Yahya. The station included a pumping facility with a capacity of 180 m²/h and a reverse osmosis system capable of producing 125 m³/h. This solution aimed to address the specific water quality issues and ensur
Previous Next